Day8 mar-8

Today we had something special at the start. There are parcels that we need to move to the nearby AU Post for a certain event LMG collaborated with A2 Milk. There were almost 10 big parcels weight around 20kg each, therefore Im required to help.

It really is a unique experience as the studio also has some work like this other than sitting on the chair all day and making things. But It was also painful as we locate at Level 2 and we have no elevators. So we have to carry the box one by one by STAIRS! Plus we only had one trolly that could only carry 2 each so we have to walk to post and back5 times. Gladly it is only about a 3-5 min walk.

After the parcel delivery which took around 5-6 hours, I went back to the work from yesterday and started to make some changes according to the feedback. As I realized having 2 themes in 1 article is a bit abrupt visually for a luxury brand. therefore I concluded the theme of the template with the photo+Film tape only.

After several testing and feedback, I finally got approved for the design.

Hours: 8hrs

Total hours:64hr

Link to Work: Week3-day2

Previous
Previous

Day9 Mar-9

Next
Next

Day7 Mar-6